4.31 out of 5
4.31
119 reviews on Udemy

Primavera Risk Analysis – Step by Step

Learn Primavera Risk Analysis from scratch
Instructor:
Gavin Drysdale
609 students enrolled
English [Auto]
1. Comprehensive Steps to Understand and Develop Primavera Risk Analysis Models
2. Importing a P6 XER File into Primavera Risk
3. Navigate the Primavera Risk Workspace
4. Check the Schedule Health
5. Test the Primavera Risk Model
6. Add Duration Uncertainty
7. Understand Templated Quick Risk
8. Introduce and Understand Correlation
9. Introduction to the Risk Register and Risk Scoring
10. Understand the Qualitative Risk Register
11. Understand the Quantitative Risk Register
12. Understand Risk Register Reports
13. Build an Impacted Risk Model
14. Run a Risk Analysis
15. Analyse the Distribution Histogram
16. Analyse the Tornado Chart
17. Analyse the Distribution Analyser
18. Learn how to add Weather Risk Events
19. Understand how to apply Percentage Leads or Lags
20. Learn how to apply Probabilistic Links and Branching
21. Learn how to Format the Gantt Chart
22. Risk Analysis Exercise (Approx. 3 - 4 hours)
23. Risk Analysis Exercise Outcome and Answers
24. Bonus Learning Section

Welcome!

This course covers a comprehensive Step by Step approach for developing a Risk Model and Running a Risk Analysis in Primavera Risk Analysis. The course objectives cover all of the modelling concepts to successfully develop a project risk plan and subsequent risk analysis, ranging from small to mega projects.

The course content applies all versions of Primavera Risk Analysis up to Version 8.7.

If you are a Project Manager, Project Scheduler, Project Controller, Engineer, Cost Controller, Risk Analyst or anyone else who wishes to learn how to apply Primavera Risk Analysis, then this course is for you.

You could also be refreshing and enhancing your skills Software Packages and want to get up and running quickly.

By the end of the course, you will be able to model risks and duration uncertainty around a deterministic schedule.

We will be covering the typical steps required for performing a schedule risk analysis, using Primavera Risk Analysis or PRA.

You will learn how to provide:

  • The probability of achieving the deterministic schedule

  • The most likely completion date

  • A range of probabilistic outcomes (such as P10 / P50 / P90) for an overall project, specific activity, package or project scope

Is preferable, but not essential that all participants have a basic understanding of the principles of scheduling risk.

It is assumed that imported files will be from Primavera P6 but files can also be imported from Microsoft Project or Deltek.

All relevant reference material will be available for download, as well as the required Risk Exercise XER project file.

As with all of my courses, I provide a comprehensive real-life exercise (that I have personally worked on) for students to complete in their own time. Answers to exercise questions will be provided in a final session. I encourage all students to complete the exercise.

For those students who are interested, there is a fully illustrated Step-by-Step eBook available for this course (235 pages).  You’ll find full details in the Bonus Learning Section.

Share it with friends
You can view and review the lecture materials indefinitely, like an on-demand channel.
Definitely! If you have an internet connection, courses on Udemy are available on any device at any time. If you don't have an internet connection, some instructors also let their students download course lectures. That's up to the instructor though, so make sure you get on their good side!
4.3
4.3 out of 5
119 Ratings

Detailed Rating

Stars 5
62
Stars 4
45
Stars 3
10
Stars 2
2
Stars 1
0
48ee17d579088d8830126ff89848318b
30-Day Money-Back Guarantee

Includes

3 hours on-demand video
Full lifetime access
Access on mobile and TV
Certificate of Completion

Featured Ad

You might like

You might like

Primavera Risk Analysis – Step by Step
Price:
$99.99 $80